Rules & Permits

HDB permits, condo approvals, working hours and the checks to make before work starts.

Articles

Renovation contract and plans on a table
Rules & Permits

Renovation Payment Schedule in Singapore: How Much and When

How much to pay and when matters as much as the price itself. Here is how renovation payments are usually staged in Singapore and how to protect yourself.

6 October 2026 · 3 min read
Painted brick wall beside a window, with a cream sofa and a brown armchair
Rules & Permits

Condo Renovation Timeline in Singapore: From Approval to Handover

A condo renovation takes longer than the works alone. Here is a stage-by-stage timeline, from design and approval to handover, and where delays usually happen.

6 October 2026 · 4 min read
Tan leather sofa with green cushions, a plant and a fireplace in a living room
Rules & Permits

Landed House Renovation in Singapore: Approvals, A&A and Planning

Repainting and new carpentry are one thing. Extending a terrace house is another. Here is where renovation ends, where A&A begins and who has to sign off.

6 October 2026 · 3 min read
Velvet armchair, round tables and a sofa beside a brick wall
Rules & Permits

Defects Liability Period in Singapore: What It Covers and How to Use It

Your renovation does not end at handover. The defects liability period is your window to get problems fixed at the firm’s cost. Here is how to use it well.

6 October 2026 · 3 min read
Timber blinds, a framed artwork and potted plants in a living room
Rules & Permits

Condo Renovation Approval in Singapore: Step by Step

No HDB permit, but a condo still needs sign-off before the first drill. Here is the usual MCST process, the documents to prepare and how long it takes.

6 October 2026 · 3 min read
Black steel roof beams against a brick wall in an industrial interior
Rules & Permits

How to Check an HDB Licensed Renovation Contractor

An HDB-registered contractor is the only kind that can apply for your renovation permit. Here is the five-minute check, and the two other licences people forget.

6 October 2026 · 3 min read
Café-style corner with a brick wall, a round table and a leather armchair by a window
Rules & Permits

BTO Renovation Timeline in Singapore: A Week-by-Week Plan

Most BTO renovations take around ten weeks of site work, but the real timeline starts months earlier. Here is the typical order of works and what to book when.

6 October 2026 · 3 min read